THUAN THANH Eco-smart IP (THUAN THANH INDUSTRIAL PARK I) – BAC NINH

Scale: 250 hectares

  • Construction starts in February 2022
  • Clean soil is ready

Advantage:

  1. Geographical location, convenient transportation
  2. Located close to Belt 4 (expected to be completed in 2027)
  3. Develop in a green and smart direction
  4. Easily choose the location and size of plots of land

The industrial park is located near Hanoi Capital, adjacent to Ring Road 4 near Hanoi – Hai Phong highway, easy to reach the seaport.

Traffic

The industrial park is located near Hanoi Capital, adjacent to the Hanoi – Hai Phong highway, with easy access to the seaport.

Technical infrastructure

Power Supply System

1 110/22kV power station with capacity of 2×63 MVA

Water supply system

The capacity of the clean water plant is 15,000 m3/day

Wastewater treatment system

The capacity of the wastewater treatment plant is 9,000 m3/day

Service Infrastructure

Police station, polyclinic, bank, warehouse, fuel supply station, post office… located near the industrial park.

Industrial Park Security

Bank

Postal

General Clinic

Logistics

Fuel Supply Station

  • Corporate income tax is 20%
  • Exemption from corporate income tax for the first 2 years
  • 50% discount for the next 4 years

Video

Phu Ha Industrial Park News