QUE VO II INDUSTRIAL PARK – BAC NINH

Total area of ​​phase 1: 269.48 hectares (Attached with overall floor plan according to planning).

Que Vo II Industrial Park was added by the Prime Minister to the planning of Vietnam’s Industrial Parks until 2015, oriented to 2020 according to Decision No. 1107/QD-TTg dated August 21, 2006 with an area of The initial planned area is 200 hectares.
On November 27, 2006, Que Vo II Industrial Park was approved by the Prime Minister to expand the planning area from 200 hectares to 270 hectares according to Official Dispatch No. 1954/TTg-CN. Que Vo Industrial Park II phase 1 was then approved by Bac Ninh province with a detailed planning scale of 1/2000 according to Decision No. 546/QD-UBND dated April 19, 2007 and the planning was adjusted according to Decision No. 1374 /QD-UBND dated October 3, 2018.
After adjustment, Que Vo Industrial Park II phase 1 has a planned area of ​​269.48 hectares within the administrative boundaries of Ngoc Xa and Dao Vien communes, Que Vo district, Bac Ninh province, of which the area is industrial land. is 188.17 hectares (accounting for 69.83% of the planned area of ​​the industrial park).

Advantages in serving production and market development of businesses…
– Distance from Hanoi center: 50 km.
– From Noi Bai airport: 50 km.
– From Tan Son Nhat airport: 1,700 km.
– From Hai Phong port: 100 km.
– 100 km from Quang Ninh port (Cai Lan).
– From Duong River port: 1.5 km.
– 1.0 km from Chau Cau Station (part of the Hanoi – Quang Ninh Railway project)
– Kieu Luong river port:
4.0 km parallel to National Highway 18
– Far from the expanded National Highway 18 intersection: 2.5 km (Connecting National Highway 18 with National Highway 1 (Yen Phong industrial park)
– Distance to bonded warehouse: 6 km.

Traffic

Internal roads
– Industrial Park intersection with National Highway 18: The frontage road before connecting to the main axis is 18.0m wide; 129m long.
– Main axis: Cross section is 50m wide/4 lanes: Road bed is 08m; 2m median strip; 16m sidewalk on each side/2m walking path.
– Internal road: Road cross section from 19 – 50m/2 lanes: Road bed 8m; sidewalk 3m, 8m (2m sidewalk)
– Maximum allowable load of vehicles participating in traffic in the industrial park: 80 tons.

Technical infrastructure

Power Supply System

Voltage of Station BA of the industrial park: 110KV/22KV/0.4kw.

Water supply system

Capacity 2,000/10,000 m3/day, VND; surface water treatment technology; inverter pump.

Wastewater treatment system

4,000 m3/day,night.1,000 m3/day,night – currently operating at 50% capacity.

Fire Protection

Equipped according to the occupied area of ​​the industrial park (currently has 01 vehicle and essential tools and equipment to serve rescue and rescue in the industrial park)

Service Infrastructure

Police station, polyclinic, bank, warehouse, fuel supply station, post office… located near the industrial park.

Industrial Park Security

Bank

Postal

General Clinic

Logistics

Fuel Supply Station

Social Infrastructure

The urban area is planned with an area of ​​4.3 hectares located 2 km from the Industrial Park

  • Corporate income tax is 20%
  • Exemption from corporate income tax for the first 2 years
  • 50% discount for the next 4 years