NAM DINH VU INDUSTRIAL PARK

Scale: 1329.11ha

  • Operational period: May 2059 – Establishment date: May 2009

  • Rental form:
    • Land for rent with infrastructure
    • Standard factory for rent/sale

Advantage:

  • Adjacent to Dinh Vu Port and Nam Dinh Vu Port, 10 km from Lach Huyen port
  • 4 km from Hanoi – Hai Phong expressway intersection
  • 15 km from Hai Phong city center, 140 km from Hanoi city center
  • 47 km from Cai Lan Port
  • 16 km from Cat Bi airport, 120 km from Noi Bai airport

Nam Dinh Vu Industrial Park is an industrial park located in the overall planning of the Non-Tariff Area and Nam Dinh Vu Industrial Park (zone 1) with a total area of ​​more than 1,329 hectares including: Industrial park (917 hectares); Seaport; Non-tariff area (210 hectares); Petrochemical area and petrochemical warehouse (62 hectares); Logistics and warehouse area (105 hectares)
Specifically, Nam Dinh Vu industrial park was approved to be added to the general planning of industrial parks in Hai Phong until 2020 according to Official Dispatch No. 180/TTg-CN dated February 1, 2008 of the Prime Minister with an area of The initial planned planning area is 1,200 hectares, planned location in Dong Hai 2 ward, Hai An district, Hai Phong city. After that, the industrial park was adjusted to increase the planning area.

Nam Dinh Vu Industrial Park project is built including 02 subdivisions:

Nam Dinh Vu Industrial Park (zone 1):
– Also known as Nam Dinh Vu Industrial Park
– Approved detailed planning at 1/2000 scale according to Decision No. 795/QD-UBND dated May 5, 2009 of Hai Phong City People’s Committee with an area of ​​917 hectares.
– The project’s investor is Sao Do Investment Group Joint Stock Company with a total investment capital of more than 2,400 billion VND.
– Operation period: From 2009 – 2059

Nam Dinh Vu Industrial Park (zone 2):
– Now it has been renamed Deep – C2A industrial park
– Approved detailed planning 1/2000 according to Decision No. 644/QD-UBND dated April 16, 2009 and approved detailed planning 1/500 according to Decision No. 2047/QD-UBND dated April 29 November 2010 of Hai Phong City People’s Committee. Deep C2A Industrial Park has a planned area of ​​513.3985 hectares, of which the area of ​​industrial land, factories, and warehouses is 397.55 hectares (accounting for 77.43% of the planned area).
– The project’s investor is Hong Duc Industrial Joint Stock Company with a total investment capital of 2,468 billion VND.
– Operation period: From 2009 – 2059

Traffic

Internal road system: Roads of Nam Dinh Vu industrial park are built widely and synchronously. The main axis of the industrial park connects directly to Dinh Vu port and has a width of 35 m – 46 m, branch roads in the industrial park have a width of 24 m – 34 m. The entire road system in the industrial park is equipped with lighting systems, sidewalks and trees on both sides.

Technical infrastructure

Power Supply System

Power source for production in Nam Dinh Vu industrial park is provided through a 110KV/22KV transformer station with a capacity of 4×63 MVA invested and built within the area. 22KV wire lines are connected along internal traffic routes to each plot of land in the industrial park.

Water supply system

Clean water source for production for manufacturing enterprises in Nam Dinh Vu industrial park is provided by the common water supply system from Hai Phong Water Supply Company with a design water supply capacity of 30,000 m3/day and night, Capacity can be adjusted to increase when water demand increases.

Wastewater treatment system

All production wastewater in the industrial park is treated at the industrial park’s centralized wastewater treatment system with a treatment capacity of 10,000 m3/day and night. In particular, phase 1 of the project with a capacity of 2,500 m3/day and night has been completed. The next phases will continue to be built when the industrial park’s wastewater treatment needs increase. The wastewater treatment system is capable of treating input wastewater from column B to column A according to Vietnam’s environmental technical standards.

Communication systems

Telecommunications and internet cable systems are underground along traffic routes in the industrial park and connected to each plot of land in the industrial park according to the needs of investors.

Service Infrastructure

Police station, polyclinic, bank, warehouse, fuel supply station, post office… located near the industrial park.

Industrial Park Security

Bank

Postal

General Clinic

Logistics

Fuel Supply Station

Investment incentives at Nam Dinh Vu industrial park: Nam Dinh Vu Industrial Park is located in Dinh Vu – Cat Hai economic zone, so businesses operating in the industrial park fully enjoy the economic zone’s tax incentive policies, including
Corporate income tax incentives: 10% preferential tax rate is applied within the first 15 years (normal rate is 20%), and 100% income tax exemption for the first 4 years and 50% reduction. Tax must be paid for the next 9 years.
Import tax incentives: Import tax exemption for goods on the list of tax incentives imported to create fixed assets for businesses.
In addition, investors in Nam Dinh Vu industrial park also receive support from the investor in investment licensing procedures and are facilitated by local authorities to shorten procedure time through the one-stop mechanism.

Video

News of Vsip Hai Duong Industrial Park