YEN PHONG 2C INDUSTRIAL PARK – BAC NINH

Scale: 658ha

  • Phase 1: 344 hectares (Project duration: 2005 – 2055)
  • Phase 2: 314 hectares (Project duration: 2016 – 2066)

Industrial park advantages

  1. Located right next to National Highway 18
  2. 22km from Noi Bai airport, 35km from Hanoi
  3. Available premises, factory can be built right away
  4. Technical infrastructure and social services are complete and synchronous
  5. Leveling height above sea level is 5m or more
  6. Viglacera Vocational College annually trains more than 6,000 students and trainees for member units of Viglacera Corporation – Joint Stock Company and businesses in industrial parks such as Samsung, Lock&Lock, Canon,…

Yen Phong urban area

Only 1.5km from the industrial park, investor Viglacera has developed Yen Phong Urban Area, providing accommodation for more than 20,000 workers including experts and workers working in the industrial park.

Cultural institution area, social housing area in Yen Phong Industrial Park

In 2019, Viglacera started construction on the Cultural Institutional Area of ​​Yen Phong Industrial Park social housing area. This is a multi-functional complex including: 01 primary school (15 classes), 01 preschool (12 classes), cultural house (capacity of 1,000 people), medical station, park Green trees, sports area,… are invested and built on a land area of ​​17,000m2

Yen Phong Science and Technology Complex

Yen Phong Science and Technology Complex – Bac Ninh is planned to include an industrial park, household production area, office – hotel area, public service area, training area, housing area, Parks and sports areas… will bring a comfortable and convenient life to experts and workers in the industrial park.

Yen Phong Industrial Park has a convenient location, right next to National Highway 18.

Traffic

The industrial park is connected to Street 18 by 4 access roads, including 3 intersections.

Technological structure

Power Supply System

The industrial park has 4 110/22KV power stations with a total capacity of 11×63 MVA

Water supply system

The capacity of the clean water plant phase 1 is 36,000 m3/day and phase 2 is 22,000 m3/day.

Wastewater treatment system

The capacity of the wastewater treatment plant phase 1 is 28,000m3/day and phase 2 is 12,000m3/day.

Nitrogen gas supply station

In the industrial park, there is a gas supply station with a capacity of 30 million m3/year.

Fire Protection

The communication system meets international standards.

Service Infrastructure

Police station, polyclinic, bank, warehouse, fuel supply station, post office… located right in the industrial park

Police Station

Bank

Fuel Supply Station

Logistics

Postal

General Clinic

Social Infrastructure

Yen Phong urban area is located 1.5km from the Industrial Park with a total area of ​​51 hectares, providing amenities for workers in the Industrial Park such as housing areas for experts, dormitory areas for workers, and Viglacera Vocational College. … The worker housing area has a total area of ​​20 hectares located right next to Yen Phong Industrial Park, providing more than 2,000 apartments for workers in the Industrial Park.

  • Corporate income tax is 20%
  • Tax exemption for the first 2 years
  • 50% discount for the next 4 years

Video

News about YEN PHONG 2C IP