VSIP HAI DUONG INDUSTRIAL PARK

Scale: 149.31ha

  • Operational period: June 2058 – Establishment date: June 2008

  • Rental form:
    • Land for rent with infrastructure
    • Standard factory for rent/sale

Advantage:

  1. The industrial park is located adjacent to National Highway 5 – an important traffic route connecting the northern provinces of the Red River Delta
  2. About 66 km from Hai Phong Port
  3. 60 km from Noi Bai Airport
  4. About 43 km from Hanoi city center

VSIP Hai Duong Industrial Park, also known as Cam Dien – Luong Dien Industrial Park, was approved by the People’s Committee of Hai Duong province with a detailed planning of 1/2000 scale in November 2007, accordingly, the Industrial Park has a planning area of 205.28 hectares, of which the area of ​​industrial land for lease is 183.96 hectares

On June 9, 2008, Cam Dien Luong Dien Industrial Park was established under Decision No. 1957/QD-UBND of the People’s Committee of Hai Duong province, with the investor of the project being Phuc Hung Company Limited. The project has an operating term of 50 years

After many years of difficulty in implementation and slow implementation progress due to problems in compensation and site clearance, in 2014 Phuc Hung Company carried out procedures to transfer the Cam Dien Industrial Park Project – Luong Dien to the new investor, VSIP Hai Duong Company Limited. On April 20, 2015, VSIP Hai Duong Co., Ltd. was officially granted an investment certificate for the infrastructure development and business project of the Industrial Park, and since then, Cam Dien – Luong Dien Industrial Park is also often called is VSIP Hai Duong Industrial Park. After receiving the transfer, in October 2015, VSIP Hai Duong Industrial Park was adjusted to reduce the area from 205.28 hectares to 149.31 hectares (reduced by 55.97 hectares in phase 1).

Traffic

Internal road system: internal roads of the industrial park are designed with a width of 26 m to 56 m, arranged to accommodate 4-6 lanes, ensuring circulation capacity. ventilation in the industrial park

Technical infrastructure

Power Supply System

Guaranteed by a 110kV/22kV transformer station in the Industrial Park, capacity of 63 MVA

Water supply system

The water source produced at VSIP Hai Duong Industrial Park is guaranteed by the internal clean water supply and treatment plant with a design capacity of 12,000 m3/day and night.

Wastewater treatment system

VSIP Hai Duong Industrial Park has a centralized wastewater treatment station with a design capacity of 4,950 m3/day and night, capable of treating wastewater.

Communication systems

Arranged ready to serve 3,000 connection lines, pre-connected to the fence of each factory in the Industrial Park.

Service Infrastructure

Police station, polyclinic, bank, warehouse, fuel supply station, post office… located near the industrial park.

Industrial Park Security

Bank

Postal

General Clinic

Logistics

Fuel Supply Station

  • Infrastructure usage fee: 125 USD/m2/until the end of the lease term (Minimum land area for rent is 7,000m2)
  • Management fee for industrial park maintenance: 0.7 USD/m2/year
  • Wastewater treatment fee: 0.45 USD/m3
  • Electricity supply price: According to EVN regulations
  • Water supply price: Applied according to the decision on water supply tariff of Hai Duong Provincial People’s Committee
  • Solid waste and wastewater treatment fees: according to regulations of the Provincial People’s Committee and Industrial Park Management Board

Note: The above prices do not include VAT and are subject to change without prior notice
Investment incentives at VSIP Hai Duong Industrial Park: 100% tax exemption for the first 2 years; 50% reduction in tax payable for the next 4 years
In addition, the investor of the Industrial Park will support investors in implementing investment licensing and business registration when leasing land to implement projects in VSIP Hai Duong Industrial Park.

Video

News of Vsip Hai Duong Industrial Park