TRANG DUE INDUSTRIAL PARK

Scale: 600ha

  • Operational period: November 2057 – Establishment date: November 2007

  • Rental form:
    • Land for rent with infrastructure
    • Standard factory for rent/sale

Advantage:

  1. 97 km from Hanoi city, 115 km from Noi Bai international airport
  2. 6 km from Hanoi – Hai Phong highway
  3. 42 km from Dinh Vu port, 45 km from Lach Huyen deep-water port
  4. 21 km from Cat Bi international airport
  5. Located near An Duong Industrial Park, Nomura Industrial Park (Japanese Industrial Park – Hai Phong), VSIP Hai Phong Industrial Park, Nam Cau Kien Industrial Park
Trang Due Industrial Park was approved by the Prime Minister to be added to the planning of Vietnam’s industrial parks in Decision No. 1107/QD-TTg dated August 21, 2006 with an initial planned area of ​​150 hectares. .On November 13, 2007, Saigon – Hai Phong Industrial Park Joint Stock Company, referred to as SHP (belonging to Kinh Bac Group) was granted the Certificate of Investment Registration for Development of Phase I of Trang Industrial Park Due with an area of ​​187 hectares.
On February 1, 2008, Trang Due Industrial Park was adjusted to increase the planning area from 150 hectares to 400 hectares according to Official Dispatch No. 180/TTg-CN of the Prime Minister. Then, in 2014, SHP continued to be granted an Investment Certificate for the Phase 2 construction investment project of Trang Due Industrial Park with a planning area of ​​214 hectares. Thus, the total area of ​​phase 1 and phase 2 that SHB is licensed to invest in is about 401 hectares.
Initially, Trang Due Industrial Park was planned in Hong Phong commune, An Duong district, Hai Phong city, which was outside the Dinh Vu – Cat Hai Economic Zone. However, to encourage investment attraction in Trang Due industrial park, on June 27, 2013, in Decision No. 39/2013/QD-TTg, the Prime Minister agreed to expand the Dinh economic zone. Vu – Cat Hai, accordingly, a total of 400 hectares of land area of ​​Trang Due industrial park is included in the general planning of the Economic Zone. However, after that, Trang Due industrial park was adjusted to reduce the area from 401.83 hectares to 389.77 hectares (down 12.06 hectares), which is the area to build worker housing for the project. belongs to LG Group (Official Letter No. 2229/TTg-KTN dated December 12, 2016 of the Prime Minister).
Based on the success of Trang Due Industrial Park phase 1 and phase 2, Hai Phong city has asked the Prime Minister to continue expanding Trang Due Industrial Park phase 3. On March 25, 2021, the Prime Minister agreed to add 687 hectares of land in 04 communes An Tien, Truong Tho, Truong Thanh and Bat Trang, An Lao district to the boundary of Dinh Vu – Cat Hai economic zone for construction. Construction of Trang Due industrial park phase 3. Currently, Kinh Bac Group is requesting to continue investing in the construction of phase 3 of the industrial park and is being considered and approved by relevant authorities. If approved, the total area of ​​03 phases of Trang Due Industrial Park will be 1,076.77 hectares.

Traffic

Internal road system: The main axis of Trang Due Industrial Park is built with a width of 40 m and 04 lanes, branch roads in the industrial park are 23 m wide, traffic roads in the industrial park are arranged in a checkerboard form, connected to each other. branching, ensuring convenient circulation in the industrial park

Technical infrastructure

Power Supply System

The entire project operating in the industrial park is powered through a 110kV/35kV/22KV transformer station with a capacity of 2*63 MVA. When phase 3 of the project comes into operation, the industrial park is expected to invest in upgrading the transformer station’s capacity to 3*63 MVA. 22 KV lines are connected to each plot of land in the industrial park.

Water supply system

Clean water for Trang Due Industrial Park is taken from Vat Cach water plant with water supply capacity of 20,000 m3/day and night and Trang Due clean water plant with water supply capacity of 5,000 m3/day and night.

Wastewater treatment system

All wastewater produced in Trang Due Industrial Park is currently treated at the internal wastewater treatment plant with a capacity of 5,000 m3/day and night. For phase 3, it is expected that the investor will build a new wastewater treatment plant with a design capacity of about 13,800 m3/day and night. Wastewater will be treated to standard A before being discharged into the environment.

Communication systems

Fully set up and ready to connect according to the needs of investors in the Industrial Park.

Service Infrastructure

Police station, polyclinic, bank, warehouse, fuel supply station, post office… located near the industrial park.

Industrial Park Security

Bank

Postal

General Clinic

Logistics

Fuel Supply Station

Industrial infrastructure rental fee: 140 USD/m2/entire lease term
Infrastructure management and maintenance fee: 0.5 USD/m2, calculated on the total actual land lease area
Annual land rent: according to the decision of Hai Phong City People’s Committee at each time
Electricity supply price: applied according to EVN’s electricity supply tariff (current price from 1,555 VND – 2,871 VND/kWh)
Clean water supply price: 18,000 VND/m3, water supply unit price may change according to the decision of Hai Phong city
Wastewater treatment fee: 0.4 USD/m3, calculated on 80% of actual clean water usage
Note: The above prices do not include VAT and are subject to change without prior notice
Investment incentives in Trang Due industrial park
Because it is located in the Dinh Vu – Cat Hai economic zone, investment projects in Trang Due Industrial Park will enjoy the highest level of investment incentives. Specifically, a preferential tax rate of 10% will be applied within the first 15 years. At the same time, 100% corporate income tax exemption for the first 4 years of the project and 50% corporate income tax reduction for the next 9 years.

Video

News of Vsip Hai Duong Industrial Park